Jump to navigation.Jump to content.Home | Contact | Legal | Sitemap
Home
Deutsch
English
漢語
Português
Español
Azərbaycan dili
Engineering and Consulting › Facility and Approval Planning › Process Engineering

  • 1: Group
  • 2: Engineering and Consulting
    • 2.1: Facility and Approval Planning
      • 2.1.1: Approval Planning
      • 2.1.2: Facility Planning
      • 2.1.3: Safety Engineering
      • 2.1.4: Process Engineering
      • 2.1.5: Construction Management
      • 2.1.6: Regional Planning and Project Development
    • 2.2: Energy and Environment
    • 2.3: Ecosystems
    • 2.4: Soil and Water Management
    • 2.5: Information Technology
    • 2.6: Technology Development
  • 3: Experts
  • 4: Publications
  • 5: News / Jobs
Process Engineering
Selected references

Selected references

Those interested are invited to request additional references of this department from Dr. Andreas Schreck.

Selected References

Year

Customer

Title

Short description

2006

CitySolar Technologie GmbH

Feasibility study for the erection of a silicon production plant. (1)

Investigation and evaluation of the boundary conditions at the Bitterfeld-Wolfen location (regulatory approval, infrastruture, technology, costs) 

2007

Elbe Flugzeugwerke GmbH Dresden

Process optimization of the pressure test facility of the EFW (1)

Analysis, evaluation, and new concepts of the pressure test facility for aircraft fuselages (generation of a positive pressure function leak test).

2007

E.S.T. Entsorgungs-gesellschaft mbH

Thermal treatment of wastes for further resource utilization (1)

Planning of the reprocessing technololgy for a desulpherization catalyzer, taking into account existing facility structures; quality design engineering as preliminary work for the approval procedure.

2007-2009

Plasil GmbH

Basic Engineering (1)

Plant for the production of silyl chloride

2008

Federal construction management of the Weser Lines

Request for proposal, construction supervision (2)

Adaptation of military airfield tank farms to the Land Ordinances on Storing, Filling, and Transporting Substances Harmful to Water (German: VawS)

2008

RWE Westfalen-Weser-Ems Netzservice GmbH 

Planning services for the erection of a biogas conditioning and injection facility in Kerpen (1)

Detail engineering, request for proposal for an injection facility for biogas into a natural gas transportation line; the conditioning encompasses the addition of air, liquified gas and odorants; the provided services revolve around the preparation of contract specifications for a turn-key plant (equipment, ET/MSR, pipework/pipe installation, cable trays, construction services, public works engineering, etc.)

2008

EnviTec GmbH

Estimation of heat emmissions from a flare system in Güstrow Energiepark (1)

Determination of heat emmissions in the form of convection and radiation - evaluation of the hazards based on protection goals. 

2008

CBW GmbH Bitterfeld-Wolfen

Study of process optimization for hexinol production. (1)

Inspection of the reaction technology in a multipurpose facility with regards to insufficient space-time effects.

 

2008

Wilhelmshavener Raffineriegesellschaft mbH

Report on the design of Flare System II (1)

Balancing of the flare system; determination of the hazards from heat radiation and toxic gas emmission (burned/unburnt).

2008

Eigensche Trocken- und Umwelttechnik GmbH

Fundamental Planning (1)

Measuring of the existing systems engineering; establishing of mass balances - formulation of a technical concept demonstrating the technological use limitations of existing plant components. 

1 - GICON References 2 - Staff References