Home
Jump to navigation.Jump to content.Home | Contact | Legal | Sitemap
Engineering and Consulting › Soil and Water Management › Megasites

Deutsch
English
漢語
Русский
Português
Español
Azərbaycan dili
  • 1: Group
  • 2: Engineering and Consulting
    • 2.1: Facility and Approval Planning
    • 2.2: Energy and Environment
    • 2.3: Ecosystems
    • 2.4: Soil and Water Management
      • 2.4.1: Remediation / Waste Management
      • 2.4.2: Megasites
      • 2.4.3: Exploration / Monitoring
      • 2.4.4: Water Body Modelling
      • 2.4.5: Water Body Management / Limnology
      • 2.4.6: Geotechnics and Mining Effects
      • 2.4.7: Hydraulic Engineering / Flood Protection
    • 2.5: Information Technology
    • 2.6: Technology Development
  • 3: Experts
  • 4: Publications
  • 5: News / Jobs
Megasites
Selected references

Selected references

Those interested are invited to request additional references of this department from Dieter Poetke.

Selected References

Year

Customer

Title

Short description

Since 2003

LMBV/MDSE

Project management of the securing of the City of Bitterfeld (1)

Project management for all measures required on the basis of the re-increase in groundwater levels and the contamination situation in the City of Bitterfeld

2003-2008

CWS

Groundwater remedial investigation (1)

Groundwater remedial investigation at the site of a former explosives factory in Schönebeck

Since 2008

GSA

Conceptual framework for remediation of the Giseltalsee Industrial Park (1)

Formulation of the conceptual framework for remediation of a site at the Giseltalsee Industrial Park in Krumpa.

Since 1999

EKO Stahl GmbH

Project management (1)

Project management for the remediation of the contaminated Eisenhüttenstadt site (work done as part of an alliance of engineering firms)

Since 1999

TEWE Energieversorgungs-
gesellschaft mbH

Project management (1)

Project management for the remediation of contamined sites in the Erkner industrial region (work done as part of an alliance of engineering firms)

Since 1999

BASF Schwarzheide GmbH

Project management (1)

Project management for the remediation of contamined sites on the BASF Schwarzheide GmbH megasite

1997-1998

EKO Stahl GmbH

Overall contaminated site professional opinion (1)

Formulation of a professional opinion regarding the contamination situation at a complex site

1997-1998

TEWE Energieversorgungs-
gesellschaft mbH

Conceptual framework for remediation in the Erkner industrial region (1)

Formulation of a conceptual framework for remediation (work done as part of an alliance of engineering firms)

1996-1998

MUNR Brandenburg
and BVS

Conceptual framework for remediation at the BASF Schwarzheide GmbH megasite (1)

Formulation of a conceptual framework for remediation

Since 1994

RP Dessau/LAF

Concept development and project management at the Bitterfeld-Wolfen megasite (1)

Formulation of the conceptual framework for remediation and ongoing updating; project management for investigation and remediation on the megasite.

1 - GICON References 2 - Staff References

GICON GmbH | Tiergartenstraße 48 | 01219 Dresden | T +49.351.47878-0 | F +49.351.47878-78 | info@gicon.com