Selected references
Those interested are invited to request additional references of this department from Dr. Claus Nitsche.
Selected References
Title |
Short description |
||
|---|---|---|---|
2009 |
Central Germany Remediation and Removal, LLC |
The following services were provided by GICON: project management; external quality contol of the groundwater remediation; conceptual design and analysis of groundwater monitoring; remedial concept for soil remediation; investigation of the contamination source and the contaminant plume; installation of groundwater monitoring wells and remediation wells; removal of monitoring wells |
|
2009 |
German Federal Ministry of Research and Technology (German: BMFT) |
Concept development of a NA- and ENA-supported remediation strategy and on-site pilot implementation at the PCK refinery as a typical site for a large-scale TPH and BTEX contamination, Sub-project1: Remedial investigation and implementation (02WN0553) The following services were provided by GICON: project management, site description, data management, appraisal of the acceptability of test fields (investigational areas), laboratory experiments (batch and acid tests), process concept for an ENA experiment, planning, tendering and monitoring of the construction of the test container for nitrate injection, concept and monitoring of the ENA test, overall evaluation of the investigational results, evaluation of the on-site potential of NA, economic feasibility study for the use of NA /ENA on site. |
|
2009 |
Central Germany Asset Management, LLC (German: MDVV) |
The following services were provided by GICON: specification and monitoring of the investigational concept at the benzene plant (continual development, DP-technology, drilling, groundwater monitoring wells, radon process) and phenol removal facility, on-site construction supervision, benzene plant remediation planning (concept testing and concept reduction, design and permit planning, implementation planning for a surface liner, soil gas remediation, and soil exchange) |
|
2007-2008 |
State of Saxony-Anhalt Regional Office for the Release of Remedial Responsibility |
The following services were provided by GICON: concept for large-scale ground- and surface water monitoring as well as detailed programs, coordination and monitoring of the surveying campaign, preparation of the campaign reports, analysis of the large-scale ground- and surface water monitoring reports through 2006 (annual reports), concept for the installation of groundwater monitoring wells / surface water monitoring stations, data management for all elevated data for the entire megasite through the use of a database (GeODin/ASA) |
|
2008 |
ArcelorMittal Eisenhüttenstadt GmbH |
The following services were provided by GICON: groundwater monitoring concept, coordination and monitoring of the surveying campaign, preparation of the campaign reports, analysis of the groundwater monitoring reports (annual reports), data management for all elevated data for the entire megasite through the use of a database (GCI-GMS) |
|
2007 |
BBG Brandenburgische Boden GmbH |
The following services were provided by GICON: the implementation of a remedial investigation including a basic evaluation, investigative concept for the source of contamination and the contaminate plume, preparation and monitoing of the award process for technical services, oversight of the provision of services, continuous planning of the field work, specification of the hazard assessment, modeling, data management for site monitoring, concept for site monitoring, preliminary work on the remedial concept |
|
2007 |
Brandenburg Environmental Authority |
The following services were provided by GICON: data research, data collection, data management, evaluation of the hydrogeologic and hydrodynamic base data and boundary conditions, calculation of the contaminant distribution according to preset methods based on point sources, formulation of a monitoring concept |
|
2005 |
Corporation for the Remediation and Development of Former Industrial Sites, LLC (German: GESA) |
The following services were provided by GICON: plausibility evaluation of all elevated data, review of the completeness of the database, suggestions for the inclusion of additional data, comprehensive evaluation of groundwater property data, development of a hydrogeological structure model, drawing of conclusions for the continuation of the contaminated remediation on site, concept for the continuation of the monitoring. |
|
2003 |
Lutherstadt Wittenberg Public Services GmbH |
The following services were provided by GICON: data research and document evaluation, investigation of the final clarification of the local hydrogeological conditions, ascertainment of the contamination situation and eradication of the center of contamination with the monitoring data, risk assessment, remedial investigation, remediation concept |
|
2002 |
Lausitz and Central Germany Mining Management, LLC (German: LMBV) |
Planning and participation during the tender and award, construction supervision of characteristic water discharge gauges with automated measurement fittings on the Main Lake dike (Nachterstedt strip mine), Mill Creek (Gräfenhainichen strip mine), Geisel/Stöbnitz (Geiseltal strip mine), discharge flow monitoring, specification of calibration curves The following services were provided by GICON: site inspection, research of appropriate measurement profiles, design and implementation planning for charcteristic water discharge gauges, preparation of the tender and award for the technical services, construction supervision, discharge flow measuring for the specification of calibration curves with hydrometric vane |